Sunday, November 30, 2008

Thanksgiving Weekend

Well, it's Sunday and Thanksgiving weekend is about over. The company gave us Thursday and Friday off for it, plus a 15 lb turkey as well. I decided to experiment this year and try to deep fry it. I've had the deep fryer for years, I won it as a perk prize at a company I used to work for. This was the first time I've tried deep frying a turkey though, I did some research on the net and came up with a general list of things, time, temps, etc... So, about noon on Thursday I got things started, it was a perfect day for it in my opinion, about 60 degrees, sunny, and almost no wind to speak of. I won't bore you with the details of watching a pot of oil get hot, I put the bird in about one o'clock and it started frying along quite happly, the only big issue came when it was about 2/3's of the way done, I ran out of propane! After a quick run to the Walgreens around the corner I had things up and running again. Everyone said the bird turned out pretty good. The rest of the weekend was spent in lazyness, watching tv and visiting friends.

Tuesday, November 25, 2008

Another day, another dollar

Not a whole lot happened today, same big bunch of idiots on the road this morning.



I don't know if I've mentioned it before, but I build industrial control panels for a living. Anyway, I got started for a second time on a big one for JJ, had to stop the first time because as usual we were missing parts namely the 24 VDC power supplies, also as usual for a JJ project. They were supposed to be in today, but they weren't, so I got the measurements for them so I could get the panel layed out and start on the rest of it.

Bit of explantion here, I am one of two full time panel builders, they other one is in charge of the panel shop and has to spend most of his time with all the paperwork, chasing parts, dealing with project managers, etc... He does do work in the shop, he just has to keep it to the smaller panels that don't take a lot of time, so that means I get all the big panels, which doesn't bother me, since one of these will usually keep me occupied for a week easy.

Ok, back to the panel. This one's a 60 x 72 inch panel, kinda the norm for JJ, a pair of 17 slot PLC racks and a buttload of terminals. I took a quick look at the layout and spent the next couple of hours laying out and mounting the wireways and din rail (it's what the terminals and other bits clip to) that's when I start on my terminal count for each rail and realize that true to form JJ's draftsman has screwed the pooch again and the actual terminal count and markings don't match up with the layout drawings and he's even screwed up several of the terminal markings as well. So, first thing tommorow I'll spend probally a hour going through the entire wiring diagram and redoing the terminal layout, hopefully it will fit on the the panel.

Oh well, in other words, a normal day at the shop for me. LOL

I feel like doing this to some of these draftsmen, I haven't found one yet that actually checks his work.

Life as we know it

It's been awhile since I've posted, life's been crazy, I'm not going to bother with a complete update, just highlights.

Went to see my folks and picked up a load of our junk.

Been working my butt off at work.

That's been about it.